Evening all, (Monday)

so by way of a bit of an update for people who are interested.

Big Thank you to Florence, Fromum, Huw, Edd H who helped today

Things achieved

hobits arm pit rotten timber and boarding removed, rotten timbers replaced
Box alta's in I rotten timbers and boarding removed, timers replaced
New wall in A began.
A lot of chalk removed from out side of goodly temple.
Litter pick of areas.
Some "bad area's" broom swept of dust and debris.
Painting of main entrance corridor began
Go to the top of the page
 
+Quote Post
duncanmatthias
post Jun 2 2015, 09:44 PM
Post #2


Mercenary
******

Group: Administrators
Posts: 1,840
Joined: 29-November 07
From: Tonbridge, Kent
Member No.: 188



Evening all, (Tuesday)

so by way of a bit of an update for people who are interested.

Big Thank you to Jasper, Christine, Rebecca, Neil M, Pacey, Washbag who helped today

Big Big Thank you to Florence, Huw, Edd H who helped for a second day

Things achieved

Some chalk removed from main corridor pile.
Litter pick of areas.
Some "bad area's" broom swept of dust and debris.
Painting of main entrance corridor continued
Timber treatment applied to structure of hobbits arm pit wall and box alta's in I
80% of chess board re-painted
Dais in rock room of B concreted.
(6 words doesn't feel enough for this, so to give people an idea, this took just over 3.5 ton of concrete wheel barrow'd in approximately 50 wheel barrows from the top steps to the dais. A trip that is half a mile. Thus 5 people and our 4 wheel barrows travelled 25 miles moveing said 3.5 tons)

Great work people!!
Go to the top of the page
 
+Quote Post
duncanmatthias
post Jun 3 2015, 07:04 PM
Post #3


Mercenary
******

Group: Administrators
Posts: 1,840
Joined: 29-November 07
From: Tonbridge, Kent
Member No.: 188



Evening all, (Wednesday)

I am home from another good day of work week action.

Big Thank you to Dave the Rave, and the LASAR Army (Jolyon, Kate, Luke, Richard and Peter) who helped today

Big Big Thank you to Rebecca who helped for a second day

Big Big Big Thank you to Florence and Huw who helped for a Third day

Things achieved today

Some "bad area's" broom swept of dust and debris.
Painting of main entrance corridor completed.
Painting of many tired and graffiti'd brick walls in the playing areas.
Tavern deep cleaned.
Hiring hall deep cleaned.
Timber structure of new wall in well room area A completed.
Boarding starting on New wall in well room.
Go to the top of the page
 
+Quote Post
duncanmatthias
post Jun 4 2015, 10:04 PM
Post #4


Mercenary
******

Group: Administrators
Posts: 1,840
Joined: 29-November 07
From: Tonbridge, Kent
Member No.: 188



Evening all, (Thursday)

I am home from another productive day, including a chance meeting with a guy called Jo, senior ref circa 1989, think we may see some old faces again soon, (p.s. Tim he says he is sorry and will return your copy of Red Dwarf he borrowed).

Big thank you to Giles W who helped today

Big Big Thank you to Dave the Rave, and Pacey who helped today for a second day

Big Big Big Thank you to Ed H who helped today for a third day

Big Big Big Big Thank you to Florence and Huw who helped for a Forth day

Things achieved today

Some general tiding of IC areas..
Painting of some tired and graffiti'd brick walls in the playing areas.
Evil temple deep cleaned.
Timber boarding completed on new well room wall.
Boarding completed on hobits armpit wall re-build
Boarding completed on area I box alter re-build.
Timber treatment applied to all new timber.
Large amounts of chalk moved from the main corridor pile by goodly temple.
"Huw's alter" the mini alter at the end of the tunnel completed.


Last day tomorrow, and still a bit to do if anyone fancies a day of cleaning, tiding and carrying in a cave tomorrow from 8:30 - 6:00, (or even just for a couple of hours if you fancy it)
Go to the top of the page
 
+Quote Post
duncanmatthias
post Jun 5 2015, 10:18 PM
Post #5


Mercenary
******

Group: Administrators
Posts: 1,840
Joined: 29-November 07
From: Tonbridge, Kent
Member No.: 188



Evening all, (Friday)

This evening draws to a close what i believe has been a very successful work week.

Big Big Big Thank you to Dave the Rave, who helped today for a third day

Big Big Big Big Thank you to Ed H who helped today for a Forth day

Big Big Big Big Big Thank you to Florence and Huw who helped for a fifth day

Things achieved today

Some general tiding of IC areas..
Second coat of paint to the chess board.
Dais in B filled capped with Sand
Steps to dais extended
More large amounts of chalk moved from the main corridor pile by goodly temple.
Walls by chess board concreted over to make platforms

I would like to take this opportunity to once again thank everyone who helped this week. I would also like to thank anyone who contributed to the Club supporter fund over the last 2 and a bit years, with out that, this week would never have been possible. If you haven't club supported yet for this year, why not do it, and we can have another successful work week later in the year.

rgds

Duncan
Go to the top of the page
 
+Quote Post

Reply to this topicStart new topic
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:

 



Lo-Fi Version Time is now: 13th December 2017 - 08:49 PM
Original Darkness Skin Created by Danellis
Converted by Mdgshorty of New Horizon Skins